This development completed in September 1981, comprises an impressive two-story building of our standard pre-cast concrete column and beam construction.
This development completed in September 1981, comprises an impressive two-story building of our standard pre-cast concrete column and beam construction.
This development started in August 1984 and substantially let from 1st December 1984, takes the form of a Piazza with 8 shops, 6 small and 2 large, surrounding the featured centre courtyard with its surface of coordinated cobbles.
This development started in October 1982 and substantially let from the 1st March 1983 is an impressive two-storey building ideally situated in the commercial heart of Bathgate.
This estate is situated less than one mile south of junction No.4 on the M8 Glasgow – Edinburgh Motorway at the meeting point with the M9 northward link road to the falkirk/Stirling conurbations.
This development completed in September 1981, comprises an impressive two-story building of our standard pre-cast concrete column and beam construction.
This development completed in September 1981, comprises an impressive two-story building of our standard pre-cast concrete column and beam construction.